Supervision, acceptance and commissioning of works Links

Training in the control of Underground Connections sites.
Formation level
Beginner - Intermediate
Domain
Engineering Underground Connection
Duration of training
21 hour(s)
Reference
INGELS10

/ Informations

Intern Profil

Project Managers, Project Assistants, Design Engineers.

Required

Basic knowledge of Underground Connections engineering.

Needed stuff

A PC and something to write with.

/ Content

• Control policy for outsourced work:
• Preparation of inspections based on the various safety documents and technical plans,
• Points of vigilance linked to feedback from RTE,
• Safety: Critical reading of a PPSPS,
• Environmental issues,
• Organisation of operations: Conditions for transferring works and responsibilities during operations on new or existing works (Exercise)
• Case studies based on photo files:
• Carrying out inspections during the works phase: what to do in the event of non-compliance, monitoring non-compliance and, more generally, monitoring the inspection plan,
• Preparing safety inspections during the works phase (DICT, marking/picketing, etc.),
• Preparation of checks during the works phase to ensure that the company's quality and environment plan is being properly applied,

/ Objective

• Prepare the inspections to be carried out on the basis of the contractual documents and the initial inspection plan,
• Prepare the checks to be carried out on the safety documents (safety coordination) to be checked on site,
• Prepare the checks to be carried out on the main environmental requirements applicable to the works (waste, etc.),
• Identify and prepare the documents required for commissioning.