Study and design of Underground Connectionss 1

Training in Underground Connections design engineering.
Formation level
Intermediate
Domain
Engineering Underground Connection
Duration of training
25 hour(s)
Reference
INGELS21

/ Informations

Intern Profil

Project Manager, Design Engineer, Project Assistant.

Required

Basic knowledge of Underground Connections engineering,

Needed stuff

A PC with the CYMCAP tool installed and something to write with.

/ Content

• Sizing an Underground Connections.
• Earthing of underground line screens.
• Thermal dimensioning.
• Analysis of data and results from the CYMCAP thermal dimensioning tool.
• Electromagnetic phenomena.
• Drawing forces.

/ Objective

• Knowing how to identify the main points likely to affect the design of an Underground Connections from the earliest design phases,
• Be able to detect, at each phase of the project, any deviations that could call the design into question (for example, deviations resulting from consultation or implementation),
• Analyse the results of a thermal design calculation for an Underground Connections,
• Define the most appropriate methods for earthing an Underground Connections,
• Calculate the pulling forces for the cables of an Underground Connections,
• Identify the EMC / Induction and Conduction impacts of an Underground Connections,
• Determine a suitable compromise for optimising the design of an Underground Connections.