Study and design of Underground Connectionss 2
Advanced training in Underground Connections design engineering.
- Formation level
- Expert
- Domain
- Engineering Underground Connection
- Duration of training
- 17.5 hour(s)
- Reference
- INGELS40
/ Informations
- Intern Profil
Project Manager, Design Engineer, Project Assistant.
- Required
Advanced knowledge of Underground Connections engineering,
Several years' experience in Underground Connections engineering.
- Needed stuff
A PC with the CYMCAP tool installed and something to write with.
/ Content
Theme - Controlling and optimising sizing and the technical part of the design:
• Analysis of the design elements to be checked,
Theme - Underpinning:
• The most commonly used techniques and their main implementation conditions,
Theme - Steep-slope engineering structures:
• Conditions to be complied with, constructive provisions,
Theme - Mechanised laying :
• Conditions for mechanised laying.
/ Objective
- • Master the thermal and electrical sizing of an Underground Connections,
• Identify the main underpinning techniques and how they are implemented,
• Identify the conditions for crossing an engineering structure by an Underground Connections, and the conditions for cohabitation,
• Identify the technical solutions for mechanised installation of an Underground Connections, and the main conditions for their implementation,
• Identify the conditions to be complied with and the construction provisions in the case of an underground structure located on a steep slope,
• Identify cases where a corrosion study is required.