Studies and design Items 1
Training in the rules for sizing and constructing an electrical substation and the rules for setting up an MSEP.
- Formation level
- Beginner - Intermediate
- Domain
- Engineering Substation
- Duration of training
- 28 hour(s)
- Reference
- INGEPO11
/ Informations
- Intern Profil
Project Managers, Project Assistants, Design Engineers.
- Required
Basic knowledge of substation and control engineering,
- Needed stuff
A PC, PPE and something to write with.
/ Content
• Assumptions for sizing a substation,
• Operation of HV equipment in a substation,
• Constructive arrangements,
• Busbar systems (frameworks, etc.),
• Earth network,
• GIS.
/ Objective
• Apply the mechanical, electrotechnical and geometric sizing assumptions for substation infrastructures,
• Draw a substation earthing circuit diagram,
• Choose substation structures on the basis of mechanical loads,
• Explain the operation of transformers, high-voltage equipment and compensation equipment,
• Identify the design methodology for a GIS.