Studies and design Items 1

Training in the rules for sizing and constructing an electrical substation and the rules for setting up an MSEP.
Formation level
Beginner - Intermediate
Domain
Engineering Substation
Duration of training
28 hour(s)
Reference
INGEPO11

/ Informations

Intern Profil

Project Managers, Project Assistants, Design Engineers.

Required

Basic knowledge of substation and control engineering,

Needed stuff

A PC, PPE and something to write with.

/ Content

• Assumptions for sizing a substation,
• Operation of HV equipment in a substation,
• Constructive arrangements,
• Busbar systems (frameworks, etc.),
• Earth network,
• GIS.

/ Objective

• Apply the mechanical, electrotechnical and geometric sizing assumptions for substation infrastructures,
• Draw a substation earthing circuit diagram,
• Choose substation structures on the basis of mechanical loads,
• Explain the operation of transformers, high-voltage equipment and compensation equipment,
• Identify the design methodology for a GIS.