Topographical support 2
- Formation level
- Intermediate
- Domain
- Maintenance Overhead line
- Duration of training
- 28 hour(s)
- Reference
- MAINLA24
/ Informations
- Intern Profil
Overhead line maintenance operators.
- Required
Employees required to carry out topographical surveys for setting up and checking the location of overhead lines,
Mastery of the CELESTE tool.
- Needed stuff
PPE, a PC with the CELESTE tool installed and something to write with.
/ Content
• Technology of associated equipment and materials,
• Distance measurement,
• Measuring heights (of hooks, obstacles),
• Checking a parameter,
• Adjusting a cable.
/ Objective
Identify the various surveying devices and equipment used at RTE:
• Set up a station at any point or at a specific point,
• Measure distances,
• Measure a parameter using the papoto method,
• Measure a parameter using the tangent sighting method,
• Exploit the results.
Make a setting:
• Carry out a setting with the help of a friend,
• Carry out a setting using the external sight method.