Detecting and tapping Underground Connectionss

Training in the detection and tapping of Underground Connectionss.
Formation level
Intermediate
Domain
Maintenance Underground Connection
Duration of training
24.5 hour(s)
Reference
MAINLS20

/ Informations

Intern Profil

Underground Connections maintenance operators.

Required

Knowledge of Underground Connections.

Needed stuff

PPE, PC and something to write with.

/ Content

• Learn how to read a plan (nomenclature, accuracy class, scale, etc.) using a Kutch (situate the structure in relation to other existing structures) and to determine the excavation height and load depth, the method of laying and earthing the screens,
• Prepare and implement an LS detection operation (choose the best detection method, assess the reliability of the results, determine the need for a second measurement using another detection method, etc.),
• Determining the instructions to be given to companies and in what form,
• Consignment of HV insulated cables,
• Rules for identifying an HV >50kV cable,
• Rules for using the "cable spike",
• Field exercises to identify and check the absence of voltage by spiking an HV >50kV cable.

/ Objective

• Identify an LS layout using standard plans,
• Locate an LS route using a detection device,
• Pass on instructions appropriate to the situation to the works companies, in compliance with legal responsibilities,
• Identify a cable in the workplace,
• Carry out a No Voltage Check by spiking the cable.